Roof Replacement in Atlanta, GA
Leaks keep coming back, the shingles are curling and bald, and patching the old roof one more time no longer makes sense for a house you plan to stay in.
- Phones answered 24/7 at (470) 876-1496
- Photos of every problem spot before any work
- Line-item written scope

Roof replacement means removing the old roof down to the decking, repairing bad wood, then installing new underlayment, flashing, vents and shingles. Atlanta homeowners usually need one when an asphalt roof passes 18 to 25 years, leaks in several spots or has widespread storm damage. For an average Atlanta home, a full shingle replacement typically runs $11,460 to $19,280, based on size, pitch and materials.
A new roof is the biggest repair most homes ever get, and most of what makes it last is out of sight. The shingles are the part everyone looks at, but the leaks we fix on five-year-old roofs almost always come from the hidden layers: rotten decking that was shingled over, step flashing that got reused, a valley with no ice barrier, or an attic that cooks the shingles because nobody fixed the venting. On a replacement we take everything off, look at every sheet of decking, replace what is soft and build the roof back from the wood up. That is the work you are really paying for.
Most replacements on a typical Atlanta home take one to two days, start to finish. We set tarps and plywood over landscaping, run a magnet sweep over the lawn and driveway, and haul off the old roof the same day. Before we start, you choose the shingle line and color, and we walk you through the details that matter on your roof: ridge vent or box vents, drip edge color, how we will handle the chimney, and what happens if we find more bad decking than expected. You will know the per-sheet cost before the first shingle comes off.

Roof Replacement on a metro Atlanta home.
Roofing materials Atlanta homeowners choose for a replacement
Architectural asphalt shingles
The most common choice on Atlanta homes. Dimensional laminated shingles from GAF, Owens Corning, CertainTeed and others cost the least per square, look good on most styles and typically last 22 to 30 years here.
Impact-resistant shingles
Class 4 shingles use a rubberized asphalt or reinforced mat to resist hail cracking. Some carriers offer a premium discount for them, so it is worth asking your agent before choosing.
Standing seam metal
Concealed-fastener steel panels last far longer than shingles, shed pine needles easily and reflect summer heat. The upfront cost is roughly double asphalt, but replacements come along much less often.
Synthetic slate or shake
Composite products from DaVinci or Brava give the look of slate or cedar at a fraction of the weight. They suit historic and high-end homes where the framing cannot carry real slate.
What roof replacement costs in metro Atlanta
Roof size in squares
Roofers price by the square, which is 100 square feet. A 22-square ranch and a 38-square two-story with a bonus room land in very different parts of the range.
Pitch and complexity
Steep roofs need harnesses and slow down every step. Many valleys, dormers and hips also add flashing, cutting and waste compared with a simple gable roof.
Decking condition
Rotted or delaminated sheathing is replaced per sheet. A few sheets barely move the total, but a roof with years of hidden leaks can need dozens.
Number of layers to remove
Older homes sometimes have two layers of shingles. Tearing off a second layer adds labor, disposal weight and dumpster trips to the job.
Shingle line and upgrades
Standard architectural shingles cost less than designer or impact-resistant lines. Upgrades like full ice barrier, new ridge vent or copper flashing add to the price.
These are typical ranges from recent Atlanta-area jobs, not a quote. See every service side by side on our roof prices page, or call (470) 876-1496 for a visit.
We install and repair shingles from GAF, Owens Corning, CertainTeed and Atlas, metal panels from Englert, membranes from Carlisle and skylights from Velux, matched to the roof already on your house.
How we replace a roof on a typical Atlanta home
Inspection and written scope
We measure every slope, check the attic and decking, note flashing and vent details and write a scope with the shingle line, underlayment, venting and the per-sheet decking cost.
Site protection
On the morning of the job we cover shrubs, AC units and patios with tarps, lean plywood against windows where needed and position the dumpster or trailer to protect the driveway.
Tear-off to the decking
We strip shingles, felt, old flashing and nails down to bare wood, slope by slope, so the house is never left open to a passing summer shower for long.
Decking repair and dry-in
Soft, delaminated or rotted sheets are cut out and replaced. Then we install drip edge, ice and water barrier in valleys and at penetrations, and synthetic underlayment across the field.
Flashing, vents and shingles
New step flashing, pipe boots and chimney flashing go in with the shingles. We install ridge vent or other exhaust and starter, field and cap shingles to the manufacturer's nailing pattern.
Cleanup and final walk
We remove debris, run magnets over the yard and driveway twice, clean gutters of granules and nails, and walk the finished roof with you, with photos of the hidden layers.
What Atlanta weather and housing mean for your new roof
Atlanta roofs age faster than the shingle packaging suggests. Long summers with high heat and humidity bake the asphalt, especially on south and west slopes, and attic ventilation in many 1990s and 2000s homes was never adequate to begin with. That is why we treat venting as part of every replacement. North Fulton, Gwinnett and Cobb are full of two-story homes with steep, cut-up rooflines, multiple valleys and walls meeting roofs at odd angles, so flashing work counts for much more than shingle brand. Intown, older ranches and bungalows often hide two shingle layers and plank decking with gaps. And with so many pines dropping needles into valleys, we pay extra attention to how valleys are lined and finished.
Photos from the ground, taken safely, help us plan the visit before we arrive.
Is it time to replace your roof instead of repairing it?
Age past 18 to 20 years
Standard asphalt roofs in Atlanta's heat and humidity usually start failing somewhere between 18 and 25 years. Past that point, repairs tend to buy months rather than years.
Curling, cupping or cracking
Shingle edges that turn up or down, or cracks running across the tabs, mean the asphalt has dried out. Wind gets under curled shingles and rips them off far more easily.
Bald spots and heavy granule loss
When the gutters fill with granules and black mat shows through on the sunny slopes, UV is breaking down the shingle. The roof is near the end of its useful life.
Leaks in more than one place
One leak is a repair. Leaks at the chimney, a valley and a vent pipe in the same season usually mean the whole system is wearing out together.
Soft or sagging spots
A roof deck that feels spongy underfoot, or a ridge line that dips, points to rotted sheathing or framing trouble. Patching the shingles will not fix what is underneath.
Widespread storm damage
When hail or wind has damaged most slopes, a repair can leave a patchwork of mismatched shingles over weakened ones. Replacement is often the more sensible fix.
Roof Replacement across the Atlanta metro
These are the largest places we cover. Every one of our 71 service areas gets the same service.
- Atlanta 30305
- Sandy Springs 30328
- Roswell 30075
- Johns Creek 30022
- Alpharetta 30004
- Marietta 30060
- Smyrna 30080
- Dunwoody 30338
- Brookhaven 30319
- Duluth 30096
- Lawrenceville 30043
- Kennesaw 30144
- Peachtree Corners 30092
- Decatur 30030
- Milton 30004
- Woodstock 30188
- Cumming 30028
- Stockbridge 30281
- McDonough 30252
- Douglasville 30134
Roof Replacement questions from Atlanta homeowners
How long does a roof replacement take on a two-story home in Alpharetta or Roswell?
Most two-story homes with an average roof take one to two working days. Steep pitches, lots of valleys, a second layer of old shingles or heavy decking repair can push it to three. Rain delays are common in summer, and we only open as much roof as we can dry in before the weather turns.
Can you replace a roof over the existing shingles instead of tearing off?
Georgia building code generally allows a second layer in some cases, but we do not recommend it. A layover hides rotten decking, traps heat, adds weight and makes flashing details worse. It also tends to shorten the life of the new shingles. On nearly every Atlanta home, a full tear-off is the better job.
What happens if you find rotten decking during my roof replacement?
We stop, photograph it and show you. Bad sheets are replaced at the per-sheet price listed in your scope, so there are no surprise numbers. On most homes we replace a handful of sheets around old leaks, chimneys or valleys. Larger amounts usually trace back to long-term ventilation problems, which we also address.
Do I need to be home during the roof replacement?
Not necessarily. We need access to the driveway, an outdoor outlet and a way into the attic if we are checking or changing ventilation. Many homeowners go to work and come back to a finished roof. Pets and kids should stay well away from the work area, since nails and debris fall all day.
Services that often go with this one
Roof Tear-Off
Full roof removal down to bare decking, with careful site protection, nail cleanup and a clear look at the wood underneath.
Learn more ›Roof Decking Replacement
Rotted, soft or delaminated roof sheathing cut out and replaced so new shingles sit on solid, dry wood.
Learn more ›Architectural Shingles
Dimensional laminated shingles that add depth, curb appeal and stronger wind resistance to Atlanta homes for a modest upgrade.
Learn more ›Need roof replacement in Atlanta?
Call (470) 876-1496. A person answers 24/7 and a roofer from our Alpharetta office follows up with a visit and photos.